The Camber Solar PV

Low Carbon partnered with the previous America’s Cup sailing team – Land Rover BAR – to power the team’s base in Portsmouth with clean, renewable energy. The rooftop solar installation has a capacity of 114kW and contributes approximately 130,000kWh of clean energy per year towards the building’s energy needs.

Site Status

Operational

Technology

Solar

Annual Production (MWH)

130

Capacity (MW)

0.1

Households powered per annum

42

CO2 emissions avoided (tonnes per annum)

60