Links Solar Farm

Located between the villages of Bradwell, Cressing and Silver End in Brantree, Essex, Links Solar Farm will produce approximately 35MW of clean renewable energy. This energy will be exported into the local network. The development is proposed for a period of 40 years.

To find out more, visit the Links Solar Farm consultation website here.

Site Status

In Development

Technology

Solar

Annual Production (MWH)

33,726

Capacity (MW)

35

Households powered per annum

11,630

CO2 emissions avoided (tonnes per annum)

7,161