The first project in a pipeline of projects in Canada, Lethbridge 1 has a tracker system in place to enhance solar production by moving the face of the solar panel to align with the sun as it moves across the sky.
Low Carbon entered into a long-term Power Purchase Agreement for the energy offtake.
The PPA will see 10 GWh of renewable energy per annum power Deep Sky’s first carbon removal project in Alberta, Canada, called Deep Sky Alpha. Lethbridge 1 will generate enough clean electricity to power 100% of Deep Sky Alpha’s operations.